Controls to mitigate Events Consequences can be viewed, added, and assigned to this page.
Here the controls are being assigned to one selected event with respect to Objectives.
From the grid above, you can assign the potential controls to mitigate the consequences of the selected event "Late Train Running" given Objectives.
You can select another event using the "Select an event:" dropdown:
Next to the index column is the "Control Name" column which lists all the controls for "Event Consequences" as rows.
The succeeding column headings correspond to the Objectives Hierarchy of your Riskion model.
The intersecting cells given the controls (row) and the covering Objectives (column) are clickable. Clicking a cell will show a checkmark which means that the control is a potential control of the event given the objective. Clicking the same cell will uncheck the cell.
From below, the control "Monthly safety meeting to review safety protocols" is a potential control to mitigate the consequence of the selected event "Late Train Running" given the objective "Loss of Customers".
The dark gray cells (disabled) mean that the event is not contributing to the objective, thus you will not be able to assign a control for it. This is true for the selected event given the "Financial Liability Due to Accident" objective in our example. You can assign to which objectives an event is contributing on the "Consequences Grid ".
To add a new control to mitigate "Event Consequences", click the button.
Here you can specify the Control Name, Cost, and categories. The Control name is required, once you enter the control name the OK button will be enabled.
The added control will be displayed as a new row on the Controls column.
You can add multiple controls at once by pasting them from the clipboard.
You can see the format by hovering on the Paste controls button
Once you are ready, click "Paste controls".