  1. Likelihood: 2D Analysis

    Overview The Two Dimensional sensitivity for Likelihood shows how well the events perform given any two threats .  In Riskion, we refer to threats , causes , hazards , and sources  interchangeably.  While they may have slightly different nu...
  2. Overall Risks with Controls

    Overview This page displays a similar grid as with the Overall Risk Results (without controls), with additional columns for results when Controls are in effect. Overall Likelihoods, Impacts, and Risks  of each Event without  and wi...
  3. Sort (Re-order) Threats

    Elements can be moved or copied from one position/level in the hierarchy to another by drag/dropping to the desired position in the hierarchy. In Tree View, you can move or copy a node from one position to another by dragging and dropping. Simply s...
  4. Manually Select Controls to be in effect

    After identifying and measuring all the potential controls, you can now select which of these controls will be in effect either: manually, or  by  optimization On this page, the controls are being selected manually.  Here you see a grid listi...
  5. Impact: Instructions for Receiver and Keypads with TeamTime Evaluation

    Plug the receiver into the USB port of the computer being used by the Facilitator. The drivers should be loaded automatically. Downloading and Installation of the TeamTime Keypad Assistant To download and use the TeamTime Keypad Assistant, make s...
  6. Risk Δ (delta) Objectives Performance

    Overview The Risk Δ (delta) Objectives  is a Performance Sensitivity analysis used to dynamically change the impact of the objectives to determine how these changes affect the risks of the events . Performance Analysis for Overall Risk of ...
  7. Impact: Datagrid

    The Impact's Datagrid page displays the attributes of the events, events consequences with respect to each objective, and the overall event impact.  Impact's DataGrid By default, the Datagrid for "All Participants" is displayed.  You can s...
  8. TeamTime Evaluation Welcome

    The welcome screen has been prepared by the Project Manager and typically contains instructions and possibly links for you to explore.
  9. Risk Map To Objectives with Controls

    Overview This page displays the same diagram as with the Risk Map To Objectives (without controls) --  with additional options to show the Risk Map when controls are in effect. Here we see the Risk Map for the Likelihoods, Impacts, and Risks ...
  10. Invite Participants for TeamTime Evaluation

    After having selected participants to evaluate the model and assigning them roles to evaluate threats, objectives, and/or events, you can invite the participants into TeamTime Evaluation.  Depending on the model you are working on, you can sele...